FT8® SWIFTPAC® power plant provides quick, reliable power – installed in less than 30 days.
Utilizing the proven Pratt & Whitney Power Systems FT8® technology, the SWIFTPAC power plant offers 30 - 60 MW of power and is designed for quick & easy installation.
The package design includes a shippable engine enclosure which incorporates the gas generator, power turbine, exhaust collector box, inlet plenum and lube system. This factory assembled module allows the SWIFTPAC power plant to be generating power in less than three weeks after arriving on site.
The SWIFTPAC package has many cost reducing benefits such as less site labor, lower site costs and less expensive shipping. Customers can also take advantage of over 50% less installation costs due to SWIFTPAC’s design and compact layout.